Yes and No.
Precast is perfect for buildings which are typical in layout and plan. If the loads coming onto the floor is non moving and lighter. Both are fast paced. Logistic is an issue. We also have issues fixing the Precast concrete panels.
Modular is better if buildings are divided into various functional units. Units are prepared off-site and placed directly on site. We also have issues with logistics and higher cost arrising from initial investment and transportation.


















