Basic Requirements Of Prefabricated Building Construction Safety Technology

Aug 07, 2022

Leave a message

precast concrete magnet

1. A special plan should be formulated for the construction of prefabricated concrete structures. The special construction plan should include the project overview, preparation basis, progress plan, construction site layout, transportation and storage of prefabricated components, installation and connection construction, green construction, safety management, quality management, information management, and emergency plans, etc.

2. The prefabricated components, installation materials, and accessories shall comply with the current relevant national standards and the provisions of the product application technical manual, and shall be subject to on-site acceptance in accordance with the provisions of the current relevant national standards.

3. Site preparation: Arrange the component yard and vehicle transport lanes reasonably according to the site conditions, review the load of the yard and transport lanes, and reinforce the floor slabs in areas that do not meet the load requirements.

4. Technical preparation: study the relevant national and local technical regulations, be familiar with the PC deepening design drawings, and use BIM technology to prepare the construction organization design, hoisting plan, edge protection plan, and safety technical disclosure of the prefabricated structure.

5. Mechanical preparation: Before installation and construction, the hoisting capacity of the hoisting equipment should be reviewed. In accordance with the relevant provisions of the current industry standard "Safety Technical Regulations for the Use of Construction Machinery" (JGJ33), check and review the hoisting equipment and spreaders in safe operation, and verify whether the site environment, weather, road conditions, etc. meet the requirements of hoisting construction; protection system Construction and acceptance shall be carried out in accordance with the construction plan.

6. Labor allocation: choose an experienced hoisting unit, and provide corresponding training guidance to hoisting laborers.

7. Model area construction: For projects with conditions, it is recommended to arrange a construction model display area, and be familiar with the hoisting process and node construction technology in advance.